Worksheet ID: |
941 |
Record Location: |
Office of State Assessed Properties
2012- current, Electronically filed
2001-2011, Bound Volumes, Cordell Hull Building State Office Bldg
Previous Volumes, TSLA |
File Arrangement: |
other - by year & County |
Media Format Generated: |
Both |
Media Format Stored: |
Electronic: Sconpreadsheet/Database |
Date Range: |
1921 - current |
Annual Accumulation: |
2 cu. ft, 3 GB accumulated in agency, .01 GB accumulated to be sent over to TSLA |
Current Volume: |
22 bound books (2003-2011) will be sent over to TSLA
.03 GB (2012-current) will be sent over to TSLA
17 GB stored in agency |
Record Value: |
Administrative, Fiscal, Historic |
Audit Requirements: |
State |
Reference Frequency: |
Current Year per Month: |
25 |
Past Year: |
10 |
2 - 5 Years: |
5 |
Over 5 Years:
|
0 |
|
Data Update Frequency: |
Yearly |
Information Shared Outside of State: |
No |
If Shared, List Agencies: |
|
Essential Record: |
Yes - Original |
Essential Record Stored: |
These records are now stored electronically and will be sent to TSLA. Bound books (2003-2011) will also eventually go to TSLA. |
Essential Record Media Type: |
Electronic |
Confidential: |
FALSE |
Confidential Legal Citation: |
|
Media Recommendation: |
Current Format |
Media Recommendation Other: |
|
Agency Retention: |
Permanent |
Agency Retention - Years Active: |
|
Agency Retention - Years Inactive: |
|
Records Center Retention Period: |
|
Final Disposition after Retention Expires: |
Transfer to TSLA |
Legal Citation: |
|
Record Sample: |
No Sample |
Legal Documentation: |
No Legal Documentation |
Electronic Records Plan Inventory |
System Name: |
IMPACT (ECM) |
IT-ABC Number: |
IG20IMPACT |
Hardware Description: |
IMPACT is a n-tier .Net application which includes Web, App, Reports, and database servers. |
Software Description: |
IMPACT is a vendor (Tyler Technologies) supplied .Net solution with an Oracle 11G backend. |
System Location: |
Cordell Hull Building
|
Backup Procedures: |
Backup procedures include nightly tapes, which are stored off-site (Iron Mountain), backups to the RMON server and subsequent copy of those files to the DR site, as well as nightly replication of the database to the COT DR site. |
Disaster Recovery: |
The recovery time objective for IMPACT is 8 hours. The DR scenario assumes that the necessary network infrastructure and connectivity is in place. In the event of a disaster the IMPACT System Administrator would simply redirect the URL to the DR URL and/or publish the DR URL. |
Data Migration Description: |
Data is stored in an Oracle RAC database. Any plan to migrate the data musts take in consideration that the data must remain in its existing format or conversion programs must account for any differences. |
Metadata Description: |
Annual appraisal and assessment of all public utility and transportation properties. These assessments are certified to counties, cities, and other taxing jurisdictions for the billing and collection of property taxes. |