Worksheet ID: |
370 |
Record Location: |
500 James Robertson Parkway
Davy Crockett Tower
Nashville, TN 37243 |
File Arrangement: |
Chronological |
Media Format Generated: |
Paper |
Media Format Stored: |
Paper/Electronic |
Date Range: |
2000-current |
Annual Accumulation: |
3 cubic feet, .1 GB |
Current Volume: |
5 cubic feet, .3 GB |
Record Value: |
Administrative, Legal |
Audit Requirements: |
State |
Reference Frequency: |
Current Year per Month: |
4 |
Past Year: |
4 |
2 - 5 Years: |
1 |
Over 5 Years:
|
0 |
|
Data Update Frequency: |
Weekly |
Information Shared Outside of State: |
Yes |
If Shared, List Agencies: |
Housing and Urban Development, Manufacturing Plants, Other State Agencies |
Essential Record: |
Yes - Original |
Essential Record Stored: |
500 James Robertson Parkway
Davy Crockett Tower
Nashville, TN 37243 |
Essential Record Media Type: |
Paper |
Confidential: |
No |
Confidential Legal Citation: |
|
Media Recommendation: |
Current Format |
Media Recommendation Other: |
|
Agency Retention: |
5 years |
Agency Retention - Years Active: |
3 years |
Agency Retention - Years Inactive: |
2 years |
Records Center Retention Period: |
|
Final Disposition after Retention Expires: |
Destroy |
Legal Citation: |
Tenn. Code Ann. 68-126-201 |
Record Sample: |
No Sample |
Legal Documentation: |
No Legal Documentation |
Electronic Records Plan Inventory |
System Name: |
CORE |
IT-ABC Number: |
|
Hardware Description: |
Linux Virtual Machine running RedHat 6.x |
Software Description: |
CORE is run through a vendor created Web Application |
System Location: |
Data Center South |
Backup Procedures: |
Every STS managed server performs nightly incremental backup to a disk storage device and is replicated to the other data center upon completion. Incremental backups are performed every night of the week and are retained for 30 days at each site. On the last Friday of the calendar month, a full backup is taken of every server and that full backup image is kept on disk for 60 days at both data centers. The full backup image is also duplicated to tape for long term storage at Iron Mountain for 7 years. The standard backup window for both incremental and full server backups is between 6pm and 6am central time. |
Disaster Recovery: |
Servers must be back online and available within 48 hours. 24 hours is the maximum amount of data that can be lost in the event of a declared disaster. |
Data Migration Description: |
Files previously located in FileNet have been migrated to the CORE system. Also, records are submitted electronically in the CORE system. |
Metadata Description: |
Metadata is captured and stored in a backend Oracle database |