Worksheet ID: |
1870 |
Record Location: |
James K. Polk Building Suite 800 |
File Arrangement: |
Numeric and Alpha |
Media Format Generated: |
Both |
Media Format Stored: |
Paper/Electronic |
Date Range: |
1990 to current |
Annual Accumulation: |
7 GB |
Current Volume: |
10 cu. ft.;
21 GB |
Record Value: |
Administrative, Fiscal |
Audit Requirements: |
State |
Reference Frequency: |
Current Year per Month: |
12 |
Past Year: |
4 |
2 - 5 Years: |
3 |
Over 5 Years:
|
2 |
|
Data Update Frequency: |
Daily |
Information Shared Outside of State: |
No |
If Shared, List Agencies: |
|
Essential Record: |
Yes - Duplicate |
Essential Record Stored: |
Copy Edison (after July 1,2009) Paper copy of contract maintained with copies of invoices in file as paper (before (July 1, 2009) |
Essential Record Media Type: |
Electronic |
Confidential: |
No |
Confidential Legal Citation: |
|
Media Recommendation: |
Current Format |
Media Recommendation Other: |
|
Agency Retention: |
l year. |
Agency Retention - Years Active: |
|
Agency Retention - Years Inactive: |
1 year |
Records Center Retention Period: |
6 years |
Final Disposition after Retention Expires: |
Destroy |
Legal Citation: |
|
Record Sample: |
No Sample |
Legal Documentation: |
No Legal Documentation |
Electronic Records Plan Inventory |
System Name: |
JJ01SDCWB00003 [SharePoint Site TBD] TDOT Contracts on State funded projects |
IT-ABC Number: |
|
Hardware Description: |
The TDOT Contracts on State funded projects are located on the SharePoint site on servers at the State of TN Enterprise VMWare farm OIR’s South Datacenter (SDC) in Smyrna, TN. The VMWare farm physically resides and runs on a series of HP DL580 Class Servers. |
Software Description: |
The TDOT Contracts on State funded projects are on the SharePoint site located at the State of TN Enterprise VMWare farm OIR’s South Datacenter (SDC) in Smyrna, TN. The VMWare Farm runs on the current level of VMWare ESX Server which is 4.1, and all TDOT virtual servers are running Microsoft Server 2008 R2 as an operating system.
SharePoint currently operates using SharePoint Server 2013 Enterprise.
Version June 2013 15.0.4517.1005 CU
|
System Location: |
OIR’s South Data Center, located in Smyrna Tennessee, hosts the servers that will be utilized for the storage to comply with both the Statewide and TDOT Electronic Records Policy. |
Backup Procedures: |
OIR will conduct backup procedures. These procedures consist of daily incremental backups and weekly total backups on the weekend. The back-up servers are Hitachi and EMC SANs.
The process for Backing Up the data from OIR’s South Data Center is to mirror the information at OIR’s North Data Center, and then create a weekly backup tape that is currently stored by the Vendor:
Iron Mountain Incorporated
Iron Mountain Nashville
6005 Dana Way
Nashville, TN 37013
800-899-4766
|
Disaster Recovery: |
OIR conducts disaster recovery. This procedure is a prioritized process of enabling critical and essential applications first and then continuing through the priority list to less significant applications. Disaster Recovery begins with the utilization of the OIR’s North Data Center for both operations and data. If both OIR’s South Data Center and OIR’s North Data Center are out of operation, new operations will begin by acquiring appropriate hardware and software from a third party supplier, and restoring data from the offline tape backups stored with the current vendor: Iron Mountain Incorporated. |
Data Migration Description: |
Data Migration will occur when support for the existing file format moves from Current to Twilight or Obsolete, or when software or hardware systems changes require the movement of RDA electronic data from a specified format to a different file format. Annual reviews will be conducted by the TDOT Records Officer and the TDOT IT Director in accordance with the Section 3 of the TDOT ERP. Additionally, the TDOT IT Director will provide information and guidance to the TDOT Records Officer at the time of discovery regarding functional and operational performance of software and hardware that will change the status of file formats from Current to Twilight or Obsolete.
The annual review process of file formats status and the level of in those file formats confidence, with regards to specific RDA retention requirements, will result in the generation of a File Type Confidence Report. Time for measuring the required three year limit for migration completion of affected data will begin at the time of discovery of the file format status change to Twilight or Obsolete, even if it is outside the annual review where it is reported with time remaining.
The TDOT IT Director will advise and develop a solution to move the data to a Current file format that is appropriate to the RDA retention requirement for the specific data. This may include translation of the data to a Current file format, conversion to an acceptable Current File format to preserve the integrity of the information of the data, or movement of the data to a legacy architecture that maintains the environment where the file format is considered Current as long as this effort has full functional and operational support.
|
Metadata Description: |
Content Subject/Title: JJ01SDCWB00003 (SharePoint Site TBD [The TDOT Contracts on State funded projects ])
Contains documents relating to contracts between Department of Transportation and vendors on state funded projects.
Date Created: 7/1/2009
Format:.doc, .docx, .pdf, .xls, .xlsx, .pdfa, .tif
Content Size: 21 GB
Location: South Data Center, in the VMWare Server Farm on Server JJ01SDCWB00003 (SharePoint Site TBD [The TDOT Contracts on State funded projects])
|